Saturday Work Days!
Reminding everyone that we are planning work days every Saturday until the mountain opens. We have a lot to do and we needs lots of hands. Please plan to donate as much time as you can. We will plan on being there from 9am to 3pm or until everyone has had enough.
Pizza will be provided.
The list of things needing to be done is as follows:
Clean and install tower pads.
Set ropes for skiing trails
Create access panels at leak locations at ceilings
Repair and sand walls.
Paint patrol room.
Lay new floor
Wax sleds
Set up 6 sleds for the season.
Trim brush and tree limbs as required.
Install neon reflective tape on chairlift safety bars so we can see if they are down from the ground.